Read this answer setEleven answers on an FOB vs CIF adhesive tape shipment: where risk transfers, who books the vessel, what CIF insurance covers and who pays at destination.
Eleven questions about an FOB vs CIF adhesive tape shipment, answered as commercial practice rather than legal advice, each with the conclusion stated before the reasoning. Freight, insurance and destination-charge figures are quoted against a named port or address and appear on no public page.
Under FOB the buyer contracts and pays the ocean carriage while the seller loads the goods on board at the named Chinese port and clears them for export, and freight prepaid adds the seller's obligation to buy that carriage and a policy as far as your port. Risk transfers at the same point in both.
No, and that reading causes more loss than any other in the term, because CIF means the freight is prepaid to the named port rather than the goods being delivered there, with risk already passed at the loading port and discharge, clearance and haulage sitting with the consignee. Ask what the freight covers on the far side.
Risk passes when the cartons are placed on board the vessel you nominated at the stated loading port, which for a Shenzhen export means the ocean vessel at Shekou or Yantian rather than the factory gate, the truck or the groupage terminal where consolidated cartons are actually handed over. Before that moment the loss is the seller's.
The rule obliges the seller to obtain cargo insurance for your risk at a minimum class rather than an all-risks one, for the invoice value plus ten per cent in the contract currency, so theft, fresh-water damage and a container missing a connection can all fall outside the cover bought. Specify a higher level in writing first.
Because a delivery term allocates obligations and never prices a terminal, since destination handling, documentation, equipment and inspection costs are set by the carrier and the port authority and billed to the consignee under either arrangement, so none of them was ever inside the seller's freight line. Ask for the charge owners on both sides.
The consignee, in nearly every case, because the free-time clock starts when the container is available for pickup and the carrier bills whoever is named on the release, regardless of whose agent booked the vessel or which term the invoice shows. Free time belongs to the carrier's tariff, so ask for it before arrival.
Neither term is cheaper as a rule, because the same physical movements get paid for either way and only the party holding the invoice changes, so a low prepaid headline can hide charges you would otherwise have negotiated while an attractive booking can hide a forwarder's local schedule. Compare landed structures line by line against one named port.
A buyer with a forwarder already under contract and a known destination charge list should keep the booking, while a buyer without one usually sleeps better on a prepaid term provided the cover level, the freight inclusions and the destination expectations are written down first. The deciding question is who chases a delayed container.
A prepaid-freight term stops at the named destination port with you handling discharge, clearance, duty and delivery, whereas a door term obliges the seller to bring cleared goods to a named place and to carry duty and tax there, which needs a full address and an agreed importer of record. Door terms are agreed per order, never assumed.
Yes, and we consolidate smaller orders as groupage from Shenzhen, but that handover happens at a consolidator's terminal before the container is loaded, so the moment the seller last controls the goods and the moment risk legally passes stop being the same event. Name the terminal and the handover point on the quotation.
It should print the term, the named port or place, the edition year, the insurance class and insured sum where freight is prepaid, and what that freight includes on discharge, because three letters and a price answer none of the questions that decide landed cost. Ask for the missing lines before signing, not after the arrival notice.
Commercial and process terms on this page are the questions a converter has to answer, not a standing offer. Order quantities, lead times, tooling charges, sample terms, freight and payment structures are confirmed at quotation against your drawing, your material and your destination, and only figures already published elsewhere on this site are stated as commitments.
Ten questions for a foam tape supplier on gap bridging, cold application, outgassing, telegraphing, moisture and…
Read this answer setTwelve questions on polyimide tape: reflow and wave masking, dwell versus peak, gold fingers, laser cutting, residue,…
Read this answer setTwelve questions on die-cut tape parts: prototype quantities, waste matrix stripping, liner nesting, tolerance…
Read this answer setTwelve answers from a tape converter in Shenzhen on quote inputs, machine ownership, brand material scope, slitting…
Read this answer setWe answer on the specific construction: what we hold, what we slit or laminate, what the quantity and the terms look like for your job.