tesa Platinum Partner · Adhesive tape converting in Shenzhen

History & Milestones

From a Shenzhen tape operation in 2017 to a converter with 1,000+ SKUs, 20+ patents and a planned production base in Fujian.

Founded 2017ISO 9001 since 2019Xiamen & Fuzhou 2020Hefei 2024
The Xiangyu Tape team at the Shenzhen plant
The team behind the plant
Timeline

How the company grew

Milestones are listed as company events. Certifications and authorizations remain subject to the current scope and documentation.

YearMilestoneDetail
2017Company foundedXiangyu begins adhesive tape operations in Shenzhen, focused on material supply and converting.
2018Conversion plant opensThe Bao’an plant starts slitting, rewinding and die-cutting, and international exports begin.
2019ISO 9001 and brand agencyThe quality management system is certified to ISO 9001, and the company becomes a regional agent for tesa and 3M materials.
2020Xiamen and Fuzhou branchesBranch operations extend the company’s coverage along the Fujian coast.
2024Hefei subsidiaryA subsidiary in Hefei supports customers in central China.
20251,000+ SKUs and 20+ patentsThe range reaches six product families, with in-house slitting, lamination, die-cutting, CNC and laser cutting.
Planned PlannedLongmen production baseAn 80-mu site in Longmen, Quanzhou, Fujian, is planned with three coating lines. It is not yet operational; timelines are confirmed separately.
Planned capacity. The Longmen site in Quanzhou, Fujian, is a planned production base with three coating lines. It is not yet operational, and any timeline should be confirmed with us before it is used in a supply plan.
Today

Material plus converting under one roof

The Shenzhen plant combines material supply, slitting, rewinding, lamination, die-cutting, CNC and laser cutting with inspection and export packing.

  • 3,000 m² plant in Bao’an, Shenzhen
  • 8 slitting lines and 6 rewinding lines
  • 4 die-cutting lines plus CNC and laser cutting
  • 1,000+ SKUs and 20+ patents
  • tesa Platinum Partner

Factory and equipment

Planning a supply review?

We can prepare company, quality and capability documents for your supplier qualification before a visit.

Contact us

Reading the timeline

What each phase changed for a buyer

A company history is only useful to a purchaser if it says what became possible when. These are the same events as the table above, read from the buying side.

PhaseWhat was addedWhat a buyer could do afterwards
2017 foundedMaterial supply and technical advice from ShenzhenSource tape grades and have the conversation in English
2018 plant and exportOwn slitting, rewinding and die-cutting, with export shipments beginningOrder a converted format rather than a purchased roll
2019 ISO 9001 and brand agencyA certified quality system, plus authorized access to tesa materialPut our records into a supplier qualification instead of only a datasheet
2020 coastal branchesBranch operations in Xiamen and FuzhouGet local support along the Fujian coast as well as in Shenzhen
2024 Hefei subsidiaryA subsidiary serving central ChinaHold a southern supply route and a central-China one at the same time
2025 range and process breadthSix product families, in-house lamination, CNC and laser cuttingSpecify a construction and its conversion in one enquiry
Longmen, plannedAn 80-mu site in Quanzhou with three planned coating linesNothing yet: it is not operational and is confirmed separately before it enters a supply plan

What a milestone does and does not prove

  • A founding year says how long the company has traded, not how long any individual has worked with tape
  • A certification year says a system was certified then; the current scope and expiry are what a buyer has to check
  • A distribution status says how material is obtained, not that every grade is authorized in every country
  • A patent count says in-house development happened; it does not describe the performance of your joint
  • A planned site is a plan, so it stays labelled as planned until it is running and can be visited
  • Repeat supply since 2018 is the practical evidence: the same part has been made twice and matched the record
FAQ

Company history questions

Is the Longmen facility producing yet?
No. The site in Quanzhou, Fujian, is planned with three coating lines and is not operational. Any timeline for it should come from us in writing before it is used in a supply plan, and today all converting runs through the Bao’an plant in Shenzhen.
How long have you exported?
Export shipments began in 2018, the same year the conversion plant started. Southeast Asia execution is described market by market on the logistics pages, and freight terms are confirmed per destination rather than assumed from the export year.
Are the 20+ patents about tape or about processing?
They cover in-house work on materials and converting processes. A patent is evidence of development activity, not a performance claim for a specific grade, so quotations describe the construction and the test data instead of leaning on the count.
Can you evidence a milestone during an audit?
Yes, during a scheduled audit visit we can walk the relevant records: the certificate for the quality system, batch and work-order records, and shipping documents for the period in question. Ask before booking so the right files and people are available.
Do the branch offices stock material?
The Shenzhen plant holds stock and does the converting. Branch and subsidiary operations extend coverage and customer support; where a delivery must come from stock, the stock location is stated at quotation rather than left to be discovered.

Want to visit the plant?

Customer and audit visits are welcome by appointment so we can arrange samples and technical staff.