Read this guideEight review items for custom die cut adhesive parts before tooling: thickness build, edge condition, release force, liner format, matrix and cleanliness.
Eight review items decide whether custom die cut adhesive parts arrive as a running production or as an expensive prototype that never scaled: layer stack, edge condition, release force, liner format, matrix handling, cleanliness, nesting, and the first-article method. Every item below is written as what to check, why it bites later, and what our answer on the drawing review looks like. Run it against any converter's quotation, ours included.
Check each layer, not the total: carrier, adhesive, liner, and any laminate in between. Why: the total on the sample is the free state; in the assembly, compressible layers take a set, and a 0.4 to 3.0 mm foam build behaves differently under load than a 0.05 to 1.0 mm double-sided construction. Our answer: the review lists every layer with its material and the thickness that matters after assembly, and flags where the stack must be laminated rather than bought.
Ask what the cut edge should look like and what "clean" means for this material. Why: soft foam and non-woven carriers smear before they sever, and adhesive squeezed onto the part face is a contamination problem nobody quoted. Our answer: edge expectation is agreed on the drawing for the named material, and the cutting route is chosen with it; die rule, laser or CNC hold different edges on different builds.
Ask for the peel behaviour of the liner against the pick method: fingers, tape-over, vacuum nozzle, gripper. Why: a release spec that suits an operator's nails fights a 0.4 mm nozzle orifice, and stringing from a soft acrylic shows up as placement errors. Our answer: release is set at review by material and liner choice, PET liners in 25 to 100 µm being the machine-fed default, and confirmed on samples pulled from the actual route.
Decide the liner before the tool: sheet for manual stations, roll on a slit liner for pick-and-place, back-perforated where parts must break out cleanly. Why: the part is manufactured twice, once in the press and once in your feeder's geometry. Our answer: the drawing review records the feed method first and treats the liner as half the product.
Ask how the waste between parts is removed, and whether any part falls out when it is. Why: matrix stripping is the default for most parts on a liner, but very small or delicate pieces weed better, and a strip that drags a light part turns scrap into a sorting station. Our answer: stripped, weeded or back-perforated is decided per drawing, and the choice is written next to the nesting.
Ask what contacts the part before the lid closes: die oil, rule wear dust, matrix fragments, static. Why: on modules and medical-adjacent assemblies, particulate is a reject with a long investigation tail, and it is invisible in an AQL sample. Our answer: cleaning level is agreed per part on the drawing review, packing follows it, and the conversation happens before tooling, not after first articles arrive dusty.
Ask for the nest layout with the utilisation number, not a per-part price alone. Why: on custom die cut work the sheet or web area consumed per good part is a major cost lever, and route choice moves it more than material choice does. Our answer: rotary roll-to-roll uses material efficiently at volume, flat-bed trades utilisation for flexibility on thick or multi-layer builds, and the quote says which one you are paying for.
Ask which route the price assumes and what the FAI will measure. Why: a part approved on a laser prototype and produced on hard tooling is a different manufacturing process, and an "inspection report" that lists nothing against your datums proves nothing. Our answer: flat-bed, rotary, laser or CNC is stated with its reason; first-article reports are issued per drawing project with dimensional and visual checks, and the achievable tolerance is stated against your drawing before tooling is cut, reviewed per material, thickness, part size and route, as our tolerance guide explains.
Items 2, 5 and 6 are the ones buyers negotiate away in the first week and reinstate after the first line stoppage. The product page lists what we convert daily, and our FAQ covers the samples and quantities we quote custom die cut parts against: prototype quantities available; production quantities agreed per part.
Commercial and process terms on this page are the questions a converter has to answer, not a standing offer. Order quantities, lead times, tooling charges, sample terms, freight and payment structures are confirmed at quotation against your drawing, your material and your destination, and only figures already published elsewhere on this site are stated as commitments.
An export packaging specification for tape rolls, element by element: core, winding direction, interleaving, edge…
Read this guideTen FOB vs CIF adhesive tape shipment questions to send a supplier before ordering: who books, what the policy…
Read this guideFOB vs CIF adhesive tape shipment: where risk actually transfers, who books the vessel, what CIF insurance covers,…
Read this guideNine questions on payment terms and risk before a first order with a tape supplier: entity, currency, milestone,…
Read this guideWe answer on the specific construction: what we hold, what we slit or laminate, what the quantity and the terms look like for your job.